Proof in the doing.
A selection of engagements that illustrate how we work. Client identities are withheld under confidentiality; project references are available under NDA.
A selection of engagements that illustrate how we work. Client identities are withheld under confidentiality; project references are available under NDA.
New GMP facilities taken from conceptual layout through detailed engineering: room layout, personnel and material flows, the HVAC and pressure-cascade scheme and the clean utilities, coordinated in a single 3D model and issued as a construction-ready, inspection-aligned package. The same method carries every facility type we design — sterile and aseptic fill-finish, oral solid dosage, liquids and semi-solids, medical devices, QC and microbiology laboratories, and warehousing.
Reviewed a new facility design against GMP requirements before construction, resolving layout, flow and classification issues on paper, where they cost little to correct, rather than on site or at audit.
From the first concept sketch to an issued-for-construction package, Agon designs pharmaceutical facilities that meet the highest international standards. We would welcome the conversation.