A method you can see through.

Good engineering is only half the work; delivering it predictably is the other half. We run every project through a clear, staged method — defined deliverables, decision gates at each stage and a single point of accountability — so our clients always know exactly where their project stands.

Our method, step by step

  1. Listen & define

    Understand the process, product and regulatory context. Establish the URS and success criteria.

    G1URS agreed

  2. Concept & feasibility

    Test viability. Shape layout, flows and budget. Close the fundamental decisions.

    G2Concept frozen

  3. Basic design

    Fix the multi-discipline solution and produce a costable, tender-ready package.

    G3Basic design approved

  4. Detailed engineering

    Model, coordinate and clash-check. Issue construction-ready documentation.

    G4Issued for construction

  5. Design support

    Answer site queries, review submittals and safeguard design intent through the build.

  6. Design handover

    Drawings, the federated model and the Basis of Design, handed over as one package.

    G5Handover accepted

Five client decision gates

No stage begins until you have reviewed and approved the one before it. The contractor builds on site between G4 and G5.

What you can count on

  • Single accountability

    One team owns the whole scope. No gaps between disciplines, no finger-pointing at the seams.

  • European rigour, regional reach

    The documentation standard of the best European houses, delivered close to your site in MENA.

  • Compliance designed in

    Design and GMP thinking together from day one, so the facility passes inspection first time.

Let’s design it right.

From the first concept sketch to an issued-for-construction package, Agon designs pharmaceutical facilities that meet the highest international standards. We would welcome the conversation.